Calendar Inspection
Weekly, monthly, quarterly, semiannual or annual — every asset carries all five. For statutory checks, safety inspections and lubrication rounds.
Demo sign-in only — no password is checked here. Picking a profile signs you in as that user so you can see exactly which sites they can reach.
| Work Order | Priority | Status | Assigned | Due |
|---|
Backlog is trending down for the third straight week. On-hold orders are mostly waiting on parts — see Stores.
| Work Order | Category | Priority | Status | Assigned | Due |
|---|
| Request | Requested by | Date | Priority | Flags | Status |
|---|
Weekly, monthly, quarterly, semiannual or annual — every asset carries all five. For statutory checks, safety inspections and lubrication rounds.
Counts meter hours, not calendar days. For compressors, fillers, sealers, wrappers and CIP services.
Fires when a logged temperature goes over (or under) the asset limit — sealing jaws, motors, chillers and boilers.
Fires on any measured value: vibration mm/s, pressure, chain elongation %, oil condition, thickness.
Fixed-interval greasing and oil top-up with the points, grease type and quantity pre-listed on the job.
Operator or tech records a reading on a route; outside the normal band auto-raises an inspection job.
| Part | Internal Part # | Mfr Part # | Bin | Stock · Min / Max | Current Price — Last Purchase | Status |
|---|
Ledger months with purchases in the current site scope. The year's earlier purchases sit in the Expense Ledger.
Every purchase order line carries one category. Stock lines replenish Stores and are picked from the Parts Master. Direct lines are bought for one job or asset — rentals, inspections and one-off parts with no SKU — and charge straight to that work order's asset and area. Service lines are external labour / service for one job — no SKU, no stock effect — and on receipt they charge that job's service cost, so a work order's service figure always traces back to its PO. All are expensed in full at purchase.
Amounts are ex-HST. Draft and Submitted POs are commitments, not expense — they enter this ledger only when received. Receiving a PO on the Purchase Orders page adds its lines here automatically, at the price paid, under their Stock / Direct category.
Preview as signs you in as that user so you can see their exact view. The Position dropdown on each row sets that person’s one position — and their home screen. Tap a site chip to grant or remove that site for a user (every user keeps at least one site). The Company Admin toggle grants admin rights — it is not a position. Positions, site access and admin toggles can only be changed by a signed-in user whose own Company Admin toggle is on; every change is recorded in the Action Log under your name. The Budget editing toggle on each row works differently: only a signed-in Controller can change it — for everyone else it is read-only.
An industrial CMMS (computerised maintenance management system) built for multi-site plants. MaintBookPro keeps work orders, preventive maintenance, parts, purchasing and maintenance money in one place — so a job, the parts and service it needs, the purchase order behind them and the cost they land are all traceable on a single record, from the plant floor to the buyer's desk.
See the whole board across every site they can access — what's down, what's overdue, what's coming from PM plans, and what it is all costing against budget.
Open a job and get the full story in one place: problem, safety and lockout notes, tasks, the parts required with quantities issued and outstanding, and locked notes as the work progresses.
Hold the parts master with bin locations, min / max levels and last-purchase prices, issue parts to jobs at the right cost, and keep the record honest with cycle counts.
Work from one list — Requirements Awaiting PO — covering short parts and external service alike. Raise the PO from the requirement itself, and every job it covers updates.
Every job is categorised by how it was created: PM preventive maintenance from a plan, CB condition based from an inspection finding, BD breakdown. Each job rolls its requirements up into one live material status — Ready, On Hand, Open Requirement or On Order — and completed jobs must be reviewed and closed within 30 days.
Calendar, run-hour, temperature and measurement plans sit on assets and generate their work orders automatically. Recurring jobs are created ahead of time — inspections at least 4 weeks ahead and PMs that need parts at least 8 weeks ahead — so parts can be ordered before the job lands.
Parts and external labour live in one requirements table on the job, with Qty Required, Qty Issued and Qty Outstanding in the same row. A fully issued line is never a shortage. Tick External labour / service required and the service becomes a requirement the buyer must cover with a PO — a service cost is never left without its PO reference.
A central parts master for all sites, purchase orders in Stock / Direct / Service lines, and a Requirements page — Requirements Awaiting PO — for the buyer. Cycle counts verify Stores on a rolling programme — every part counted at least once every 12 months — and posting a count adjusts stock to what was actually on the shelf.
Budgets (FY budgets by area), Spend by Area, Spend by Asset, Work Order Costs, and the Expense Ledger — each on its own page under the Financials heading. All parts are expensed once, at purchase; work order cost (parts + service) is attribution, locked when a job is marked Complete — the two are never added together.
Assets down the side, time across the top — Days, Weeks or Months. Solid bars are scheduled work orders coloured by category; dashed bars are the PM jobs plans will generate, so clashes and pile-ups show before they happen.
The company is the top level, sites sit under it, and every user belongs to one company with access to one or more of its sites. Sites a user doesn't have simply don't appear — in the selector, counts, lists, schedule or search.
A background audit trail written automatically as people work — sign-ins, job and task changes, readings, issues, POs, counts, budget and access changes — each stamped with the user, company, site and time. Entries cannot be edited or deleted.
Downtime by Site — Last 7 Days
| Work Order | Category | Status | Material Status | Due |
|---|
| # | Task | Done | Completed By |
|---|---|---|---|
| 1 | Make safe, inspect & record the as-found condition Lockout LOTO-114 applied · hot jaw — allow to cool before handling | ✓ | Mike Chen Nov 23, 2026 |
| 2 | Flow wrapper sealing jaw failure — packs not sealing | ✓ | — |
| 3 | Test, hand back & close out | ✓ | — |
Parts & Service Required
| Part Required | Type | Qty Req | Qty Issued | Qty Outst | Bin | Material Status |
|---|---|---|---|---|---|---|
| Sealing jaw set SJ-NBL2 $486.00 charged · Stores credited | STOCK | 1 kits | 1 kits | 0 | A-01-B-12 | ISSUED FROM STORES |
| Heat-seal Teflon tape — 2 rolls | STOCK | 2 rolls | 0 | 2 rolls | L-01-A-05 | MATERIAL ON HAND |
| OEM sealing-jaw technician call-out & calibration Syntegon Packaging · $195.00 | SERVICE | 1 job | — | 0 | — | SERVICE RECEIVED PO-8816 |
Schedule — Days View
| Part | Internal Part # | Bin | On Hand | Min | Reorder | Max |
|---|---|---|---|---|---|---|
| Sealing jaw set — NB-L2 flow wrapper | SJ-NBL2 | A-01-B-12 | 1 kits | 1 | 2 | 4 |
| Photo-eye sensor PE-44 | PE-44 | C-02-B-12 | 0 pcs | 2 | 3 | 6 |
| Desiccant cartridge — dryer NB-AIR | DC-NBAIR | A-01-A-07 | 4 pcs | 1 | 2 | 6 |
Requirements Awaiting PO — For Buyer
— waitingBudget by Area — % Used
Eight scenes through the app's real screens: the dashboard, the PM / CB / BD board, one job's full record (BD-2481), PM plans and the Gantt, Stores and the buyer's list, and the Financials category's Budgets page. It plays on its own when you open this page — hover or tap the stage to pause it, or step through with the controls.
The deck version of the story — the problem, the work order board, PM plans, the buyer flow, the Financials pages and access — ready to present or send on.
Download PowerPointThe printable leave-behind: what MaintBookPro is, who it's for, and how work orders, parts, purchasing and budgets connect — in six pages.
Open / download brochureThe Northgate Foods company, sites, people and figures shown throughout this app are demonstration data.
Pick the category by how the job was created. It lands at the top of the work order list under that category.
Report a problem. A Planner, Site Lead or Corporate reviews it — approved requests become work orders.
Set the trigger once — the plan auto-generates its work order from the start date onward.
Creates a Draft PO in the Purchase Orders list. Review it there, edit quantities, then Submit. Each line is Stock (replenishes Stores), Direct (bought for one job) or Service (external labour / service for one job — no SKU, no stock effect; receiving it charges the linked work order's service cost) — all are expensed at purchase, when the PO is received.
Annual maintenance purchase budgets by area, for Northgate Foods Inc. (all sites), with the reforecasted budget — the updated full-year expectation — beside each annual figure. Spend, remaining and % used are tracked against the annual budget; the reforecast is shown alongside it. Changes are written to the Action Log.
Creates a cycle count document in Draft. The system quantity on each line is frozen at creation — then open the document, enter what you actually count on the shelf, and Post to adjust stock.
About this screen